The first step in the electrical system overhaul got done today, the front and rear junction boxes got installed. Next step is to get the get the cable branches installed nice, and start putting holes in the boxes for the cables to run into.
Tuesday, May 26, 2009
Electrical Boxes Installed
The first step in the electrical system overhaul got done today, the front and rear junction boxes got installed. Next step is to get the get the cable branches installed nice, and start putting holes in the boxes for the cables to run into.
Labels:
Porsche 914-EV
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment