Wednesday, January 20, 2016

EE Meeting: Car Startup Sequence

On Tuesday, the EE subteam gathered to discuss the Opel’s startup sequence. We hammered out a specification detailing all the steps between initial turn of the key to Motor Controller enable. The discussion revolved around several themes:
  • In what ways should the Opel’s startup sequence be similar to the startup sequence of a conventional gas-powered car?
  • How robust should each electrical module be to failures in the other modules?
  • In the case of a failure, how much decision-making responsibility should the driver be given? Should the driver be warned with an indicator on the UI? Should the car be allowed to start up if the failure occurs in a nonessential module?
  • Which systems should turn on which other systems? In what order? How do we check that the required systems are functioning correctly?
  • Since the DI’s codebase is already very large, the team expects an increasing probability of bugs as the new startup sequence is coded into the DI state machine. What steps should be taken to combat this?
Startup sequence

Clutch and turnkey
Old DI state transition diagram (to be updated with changes to startup sequence)


Monday, January 18, 2016

MechE: Playoff Saturday!

A quick turnaround from the all-nighter on Thursday, and the gang was back where we left off!  We needed to take some ride height and suspension measurements on faculty advisor, Professor Dan Frey's original Opel, so he invited us over to his house to inspect the Opel as well as watch the Pat's Playoff game against the chiefs.  

The squad made it in early to make up for the time, with Ryan getting right to CAD practice on the 2D transmission mounting parts.

 

Alex and Alberto continued cutting the necessary support members for the rear suspension structure, according to the CAD that we began to finalize on Thursday night.


 Crazy Jake continued cranking away as the team librarian, reading up on some serious suspension research in order to make sure that we would take the correct measurements at Dan's house.


The frame is slowly beginning to take shape, and we're hoping to install the motor/transmission assembly soon.  EVT legend John Kongoletos was back to offer some mentoring to the young welders!


Jarrod continued working through the CAD and relaying the measurements to the weld team...in addition to getting everyone setup and organized with Solidworks EPDM on their personal laptops.  


After lunch, the MechE subteams met with their EE team counterparts to discuss the integrated tasks such as enclosures and throttle setup.  Then we were done for the day, packing it up and heading to Dan's house.


The trip is never complete without checking out Dan's chicken coop and holding the hens!



The young members got a chance to meet Dan and we had a good time taking a break from welding to watch the game.  At least most of us were happy that the Pats won!


 At halftime we made it out to Dan's garage, where he gave us the rundown on all of his vehicles and current car projects....


And Crazy Jake got down to take all of the necessary Opel measurements to take back to the shop.  Overall it was a successful & productive day, and a fun time hanging out with Dan.  Now we just have to finish up the electric Opel for him!  Two more weeks of IAP, let's go!


Friday, January 15, 2016

MechE Marathon Thursday is back!

The MechE Team tradition of staying up late on Thursday nights was reinstated yesterday!  With much work to be done, nearly the entire team made it out for the "other 9 to 5" Marathon Thursday work party!


After the weekly team organizational meeting, it was all hands on deck for the MechE crew.  The remaining Miata control arm mounting components of the original subframe were ground down and sanded, with the necessary jigs and fixtures put in place to prepare for welding. 


A combined effort of welding and CAD-ing at the same time brought everything together, and it's looking like the new subframe geometry will fit nicely in the rear of the car! 


Alex and Z were able to design the lower deck for supporting the batteries, and AA was able to weld it all together.


The frame still needs further development and construction, but the dimensions have now been confirmed and everything appears to be aligned correctly.


Saturday's meeting will focus on incorporating and mounting the drivetrain components, and proceeding to attach the entire assembly to the scrap Opel frame.  Still much work to be done, but we're hoping to be starting the installation process on the black Opel next week!


After a long work night, there's nothing better than the routine trip to Beantown right before it closes at 4AM!  



Wednesday, January 13, 2016

EE Module Design Review: Wheel Velocity Sensor

On Tuesday, all the EE's gathered for the first module design review.

Electronics architecture (depicted on whiteboard)


The Opel's electronics architecture is designed to be modular. It consists of a number of modules where each module is designated a specific high level function, such as logging or sensing. The Opel's Vehicle Controller Area Network (VCAN) bus facilitates communication of data between the modules. Over the past semester, members of the EE crew have been working out the implementation details of their assigned modules. While each module is derived from the same generic design, members must specify the code and any auxiliary electronics required for their specific module.

Dev board, which shows the generic PCB layout


The module design review on Tuesday was for the Wheel Velocity Sensor (WVS). The purpose of the WVS is to measure wheel velocity and relay this information back to the Driver Interface (DI) module over VCAN. Separate WVS modules exist for the right and left wheels. Should the car enter a prolonged drift, the DI would be able to sense the condition from WVS messages and respond appropriately.

The design review began with an overview of the WVS operating principle. Essentially, the WVS measures motor speed from the frequency of the sinusoidal back-EMF waveform. Designers Allison (sophomore) and Helmuth (freshman) took us on a deep dive into the underlying analog signal conditioner schematic. The circuit uses a comparator with added hysteresis to transform the motor back-EMF waveform into a square wave. On the embedded end, the LPC microcontroller computes the wheel velocity from pulse period and broadcasts this data over VCAN.

WVS schematic


Next, the designers walked us through the PCB layout. The WVS specific analog circuitry is located in the middle of the right half plane of the PCB model below.

Wheel Velocity Sensor PCB


The design review was very successful. Designers did a great job presenting, and members were able to walk away with a better understanding of the WVS's inner workings. We were able to evaluate design choices, change component values, and catch typos. Among other things, we decided that 12V logic would probably not be suitable for our 5V tolerant microcontrollers.

Miata Modifications continued

Tuesday night.  Still planning on Marathon Thursday later this week, but it's been marathon every night so far.  Gotta make the most of IAP!

Crazy Jake is back in action, reading up on some new suspension books from the library.


Jarrod and Ryan looking at the CAD, and working through the new assemblies.  After taking some measurements on the actual Opel, we are trying to get the solidworks models for the subframe assembly to be as true to form as possible.  


After some investigation, they realized we need to lose about four inches in width between the wheels to get the geometry in a desirable configuration.  Although the original miata subframe fit nicely between the Opel frame members, we're going to need to chop it up a bit.


All hands on deck in Dlab!  We're still working there, where we have ventilation for the angle grinder usage, and we can help out our students taking our AIBD course this IAP.


We cut down the members to give sufficient clearance, and began work on setting up a jig to hold everything together in the proper orientation.  We hope to get all the fixtures in place so that we can begin welding on Thursday.





Monday, January 11, 2016

Suspension: Drivetrain Incorporation

Monday night, and we keep rolling through the week.  The eGear Transmission unit is a bit too wide to fit cleanly through the top of the original Miata subframe, so Ryan and Jarrod worked on cutting it up to provide the necessary clearance.


We needed to remove about an inch from the interior support members on each side.  Ryan is quickly becoming proficient in using the angle grinder.


Big thanks to Dlab, giving us some space to work with all of the necessary safety protection.


The motor and transmission are now bolted together.  The transmission fits down the middle, with the motor temporarily supported on the top surface of the subframe.  We are still considering how to clean up the subframe and how the final structure will look.  For now, it just has the exposed open tube.


Of course we can never leave well enough alone, and Jack, Nate, and Jarrod ended up having a motor+transmission deadlifting contest.  No need for an engine hoist!



Sunday, January 10, 2016

Suspension: Miata Modification

First Saturday work day of IAP for the MechE team!  Plenty of new work to do now that we have the new parts.  We're hoping that the Miata suspension geometry provides an adaptable platform and valuable reference for developing our independent Opel suspension.


Colonel CAD Alberto was at it immediately, focusing on generating Solidworks models for the Miata subframe structure, and then the control arms and knuckle.


Alex and Z went to town on battery duty, starting to work with the subframe structure team to design the battery support structure in the rear of the car.  We hope to be integrating the battery mounting CAD into the rear subframe models soon.  


Ryan and Olivia are working on mounting the Miata/Suspension+Motor+Transmission subframe into the Opel frame.  Testing is taking place on the old rear half of the white Opel that we still have in the back room.  



It is still unclear if we will need to cut away the wheelwell/frame in any places in order to allow clearance for the upper control arm in the new independent suspension layout.  The previous design with the straight axle had no problems, but Ryan and Olivia cleared out some space with the angle grinder so that we could take the necessary measurements.









The goal is to get rid of the white Opel shell in the very near future.  The solidworks models are coming together, and we hope to have an integrated subframe prototype sometime next week.